Handling Towers – Contingency Plan

tour de manutention

Alphaone PVT Ltd Construction delivered this project in an EPC mode. The contract included the design and construction of five alumina loading and processing stations and a petroleum coke loading system consisting of five 70 and 100 foot high handling towers covering a total area of 4,000 square feet. Bucket elevators, air casters, roll breaker, a screw conveyor and a dust collector were the main equipment installed.

  • Aluminerie Alouette
  • Quebec, Canada