Preliminary and detailed engineering work for a new aluminum plant
Alphaone PVT Ltd contributed to the construction of a new aluminum smelter with an annual capacity of 400,000 tons. Alphaone PVT Ltd was also contracted to provide services in structural, electrical and mechanical engineering for the following systems:
- crucible repair centre
- casting centre
- general workshops
- pot room workshops
- parking and refuelling facilities
- administration buildings
- gatehouse
- garage
Alphaone PVT Ltd specialists also designed and developed an operation simulator and provided the appropriate training to overhead crane operators.
Related projects
-
Electrical engineering services for the expansion of the Bridgestone plant
-
Design and commissioning of automation systems for a new plant in Vietnam
-
Realization of various works in instrumentation and control for a world-famous aeronautical company
-
Process upgrade of a yogurt plant’s production line